Construction start: Royal Victoria College (RVC) Residence - Masonry work
Please be advised that 不良研究所 has mandated Atwill-Morin Ma莽onnerie to carry out the following project:听22-036 (RVC Residence - B180) - Restoration of rendering on rear fa莽ades
顿别蝉肠谤颈辫迟颈辞苍:听The project involves restoring the rendering on the rear fa莽ades of the Royal Victoria College (RVC), a student residence building, located on University Street.
Construction start date: July 2nd, 2024
Planned construction end date: End of October听2024
Work schedule:听Monday to Friday, 6 a.m. to 4 p.m. (work likely to generate higher levels of noise will not begin before 9 a.m.)
听
Project Manager:听Jocelyn Blanchet -听jocelyn.blanchet [at] gph-inc.com
Assistant Project Manager:听听Pierre Beauchamp -听pierre.beauchamp [at] gph-inc.com
Contact for building users:听Jonathan Rousham -听jonathan.rousham [at] mcgill.ca
Scope of work:
The project consists of restoring the rendering on the rear fa莽ades of Royal Victoria College. It will include only exterior work, such as:
- installation of building access guards
- installation of scaffolding
- cleaning of all surfaces
- removal of existing masonry joints
- final cleaning
- removal of scaffolding and access protection
Impact & mitigation:
The contractor is required to choose the work methods likely to generate the least noise and vibrations.